Oil nitrogen oxide waste gas treatment project

This project was put into operation in April 2020. It is used to treat high-concentration nitrogen oxides produced by the dissolution of platinum, palladium and rhodium regia. It adopts two-stage bubbling absorption + three-stage jet absorption + one-stage SDG adsorption + two-stage water spraying for treatment , the emission indicators of the treated waste gas meet the requirements of the state and the owner.

So far, the waste gas treatment equipment has been running stably.

Product Description

Oil nitrogen oxide waste gas treatment project

Free Contact

The company's main business: silver electrolysis unit, gold electrolysis unit, nitrogen oxide waste gas treatment system equipment, platinum, palladium and rhodium refining and purification production and other common equipment

This project was put into operation in April 2020. It is used to treat high-concentration nitrogen oxides produced by the dissolution of platinum, palladium and rhodium regia. It adopts two-stage bubbling absorption + three-stage jet absorption + one-stage SDG adsorption + two-stage water spraying for treatment , the emission indicators of the treated waste gas meet the requirements of the state and the owner.

So far, the waste gas treatment equipment has been running stably.

Contact Us

Related Products

Aqua Regia Precision Filtration Cart

Aqua Regia Precision Filtration Cart Precious Metal Filtration System: Stable operation with simple processing methods. High Thermal Efficiency & Pressure Resistance: Ensures long production efficiency and service life. Premium PP

Read More »

PPH Bubble Absorption Tank Series

PPH Bubble Absorption Tank Series Our manufacturing process uses one-time winding extrusion molding to produce the complete PPH bubble absorption tank series. This highly automated method ensures precise compliance with design specifications while allowing

Read More »
Translate »