6,000-Ton Annual Precious Metal Catalyst Recycling Plant Commissioned in Xinjiang by Zhengzhou Jinquan

Product Description

6,000-Ton Annual Precious Metal Catalyst Recycling Plant Commissioned in Xinjiang by Zhengzhou Jinquan

Free Contact

The company's main business: silver electrolysis unit, gold electrolysis unit, nitrogen oxide waste gas treatment system equipment, platinum, palladium and rhodium refining and purification production and other common equipment

Project Overview: Xinjiang Catalyst Recycling Plant Enters Final Phase

Zhengzhou Jinquan has successfully delivered and commissioned an annual 6,000-ton precious metal catalyst recycling plant in Xinjiang. The facility processes both ternary and petrochemical catalysts.

Key Milestones and Construction Progress

By November 2023, project manager Zhang Kong and his team had completed installation of the full recovery and refining system after six months of intensive work. They executed all construction and inspection tasks in an orderly manner, including the installation of cable trays and cover plates across key process areas such as smelting, iron removal, extraction, and refining.

Project Timeline and Handover Plan

In an interview with China News Service, Zhang Kong stated, "We have achieved 98% construction progress and are currently finalizing remaining tasks. We plan to conduct equipment and pipeline water testing next spring, after which we will formally hand over the plant to the client."

Investment and Expected Launch

The project represents a total investment of nearly 200 million yuan and is scheduled to commence operations in the first half of 2024.

Economic and Social Impact Forecast

Mr. Zhou, Marketing Manager of the client company, commented, "Once operational, the plant is expected to contribute approximately 40 million yuan in profit and tax revenue annually and create around 100 local jobs."

Overcoming Project Challenges

Despite the large volume and diverse types of raw materials, which made execution more complex than typical catalyst projects, the team completed construction within six months. Their performance has received strong recognition from the client and media, further solidifying the Jinquan brand.

Team Leadership and Reflections

Zhang Kong reflected on the execution phase: "Our equipment and processes are mature, which ensured client satisfaction. Leading a team of over thirty people on-site required overcoming numerous logistical challenges. We arranged local housing, brought a dedicated cook, and coordinated vehicles transported from Zhengzhou as well as locally purchased units."

He concluded, "Our company placed high strategic importance on this project given its national-scale significance. Successfully delivering it, much like our earlier large-scale project in Hebei, brings us tremendous professional pride."

Contact Us

Related Products

Aqua Regia Precision Filtration Cart

Aqua Regia Precision Filtration Cart Precious Metal Filtration System: Stable operation with simple processing methods. High Thermal Efficiency & Pressure Resistance: Ensures long production efficiency and service life. Premium PP

Read More »

PPH Bubble Absorption Tank Series

PPH Bubble Absorption Tank Series Our manufacturing process uses one-time winding extrusion molding to produce the complete PPH bubble absorption tank series. This highly automated method ensures precise compliance with design specifications while allowing

Read More »
Translate »